DailySafe · Original safety guidance written by DailySafe
Workplace safety encyclopedia
From today's work and hazard checks to TBM, corrective actions and time records. Find DailySafe's own guidance and official primary sources in one place.
Regulatory and technical material is under review and does not replace qualified on-site assessment.
61 safety topics
Browse work, hazard identification and correction, site records, company operations, law and reference material.
Browse 61 topics →0216 detailed field guides
Checks before and during work and records to retain, organized by trade, equipment and role.
Read 16 guides →036 reference templates
Editable Korean-language templates created by DailySafe. These are not mandatory official forms.
Open Korean templates →04Official primary sources
Links to official laws and material from the labor ministry and KOSHA. Not a statement of agency affiliation.
Open official sources →Find guidance by trade and role
Confirm today's work
Trade, location, workers and changed conditions
Identify hazards
Hazards and required safeguards
Communicate and confirm understanding
TBM, questions and additional explanations
Respond during work
Changing conditions, hazard reporting and necessary work stoppage
Verify corrections
Responsible person and reinspection before and after action
Review records
Participation, work time, corrections, disputes and document retention
16 detailed field guides
All guidesConstruction trades
Facade painting combines risks from work at height, coatings and pedestrian movement below. Conditions can differ even between opposite sides of the same building; assess each work area and explain changes in the daily briefing.
Interior painting: ventilation, chemicals and access controlIndoor finishing involves ventilation, exposure to coatings and thinners, ladders, temporary electricity and overlapping trades. The product safety data and actual conditions matter more than a familiar product name.
Roofing and waterproofing: edges, openings and weatherRoof edges, skylights, fragile surfaces, material transport and weather affect fall risks. Some waterproofing methods additionally introduce heat, fire or chemical hazards.
Parking and floor coatings: traffic, chemicals and conflicting workVehicle movements, mechanical grinding, dust, chemicals, slips and shared work zones may overlap. Posting a closure sign is not the same as effectively preventing entry.
Demolition: structural changes and exclusion zonesThe sequence of demolition affects a changing structure's stability. Loads, services and debris may create dangers that are not visible; follow a suitable approved work method and assessment.
Masonry and plaster: materials, mixers and exposureMaterials, mixers, temporary power and work platforms often move during masonry and plaster work. A checklist must reflect the current work area.
Welding and cutting: fire, electricity and nearby tradesWelding creates heat and sparks near combustible materials, electrical or gas systems, ventilation and other simultaneous work. Check the scope of any applicable work permit.
Equipment and systems
Accessing a height is itself part of the risk. Selecting a scaffold or ladder does not prove that it is suitable for the task, surface or duration.
Temporary electricity: cables, distribution and moistureTemporary power systems move with work zones and face moisture, dust and equipment traffic. Electrical repair and authorization must remain with qualified personnel.
Forklifts and pedestrians: managing intersecting routesA pedestrian entering a forklift operating zone is exposed to the operator's limited view and the moving load. Floor markings must match actual traffic.
People and roles
New arrivals need to understand access, today's work area, hazards and emergency contacts. Their statutory training needs may differ from those of returning workers.
Foreign-language workers: safety information they understandA fluent automated translation is not proof that a worker understands a site hazard. Explain equipment names, precise locations and prohibited actions, then check comprehension.
A foreman's day: start, changes and handoverForemen connect pre-work communication, changed conditions and the work-record review. Site coordination is not the same as unrestricted company-level authority.
General and subcontractors sharing a siteWhen multiple contractors share a location, responsibility for creating, communicating and controlling hazards can be unclear. Sharing the same software does not transfer legal duties.
Incidents and records
An event that caused no injury can still reveal a serious hazard. Reporting, immediate protection, a lasting correction and subsequent review are different steps.
When records differ: original entry, dispute and correctionWhen work hours or safety acknowledgments are disputed, keep the initial statement distinct from the objection. Allowing a correction is different from preserving an auditable history.