Each claim is connected to its source and explicitly scoped to what the evidence actually establishes.
E-01 · Engineering evidenceVerified as of: 2026-09-11
DailySafe technical guarantee evidence register
Documents invariants, API/DB tests and boundaries for history, access control and value confirmations.
Evidence boundary: A technical record, not a certificate of production deployment.
Evidence · E-01 →E-02 · Formal modelVerified as of: 2026-09-12
Formal policy-pinning and historical policy integrity map
Lean 4 theorems A2_policy_pinning_strict and A3_deny_retroactive_strict are mapped to product policy semantics.
Evidence boundary: A model-level proof is not whole-product formal verification.
Evidence · E-02 →E-03 · Formal modelVerified as of: 2026-09-12
Lean 4 formal proof map
Documents A5_append_only, A0_event_provenance_strict, pipeline_consistent and related theorems.
Evidence boundary: The correspondence to FastAPI/PostgreSQL implementation requires separate verification.
Evidence · E-03 →E-04 · Software testsVerified as of: 2026-11-04
M4/M5 adversarial software test run
76/76 targeted CI tests passed, covering tampering, deletion, rollback, a separate HTTP process, public-key verification and retroactive-TBM rejection.
Evidence boundary: Software CI evidence, not independently governed production-host evidence.
Evidence · E-04 →E-05 · Engineering evidenceVerified as of: 2026-09-11
Access-scope and semantic-confirmation test evidence
Documents tests for cross-organization denials, authority-at-effect and changed values after confirmation.
Evidence boundary: Covers specified API/DB paths, not every possible threat.
Evidence · E-05 →E-06 · Filed applicationVerified as of: 2026-09-03
Filed patent-application reconciliation
Reconciles selected DailySafe-related filings with the private filing register.
Evidence boundary: Filing is not patent grant or proof of implemented coverage.
Evidence · E-06 →